18:50 Kempton Park

Wednesday 12 December 2007

All18:2018:5019:2019:5020:2020:5021:20

Afm Services Data Centre Construction Handicap

  • 3YO plus  |   Class 6  |   1m 2f  |   Standard  |   13 Runners  |   Unknown  |   Weighed In
  • Off time: -  |   Winning time: -
The word Sky in blue and Bet in white with a red background.
The word Betfair in black.
The words Paddy Power in green.
Cloth number
Odds
Horse A-Z
2
(8)
Horse silk
Mr Napoleon (IRE)
Age: 5|  Weight: 9-2| J: G Baker| T: G & J Moore| OR:  55
11/2
3
(1)
Horse silk
12/1
4
(11)
Horse silk
Mythical Charm
Age: 8|  Weight: 9-1| J: J Dean| T: J J Bridger| OR:  54
16/1
7
(9)
Horse silk
Jarvo
Age: 6|  Weight: 9-0| J: A Elliott| T: I W McInnes| OR:  53
14/1
9
(13)
Horse silk
Glenridding
Age: 3|  Weight: 8-13| J: T P Queally| T: J G Given| OR:  55
9/1
12
(3)
Horse silk
Theatre Royal
Age: 4|  Weight: 8-11| J: N Chalmers| T: Mouse Hamilton-fairley| OR:  50
20/1
13
(4)
Horse silk
Wind Flow
Age: 3|  Weight: 8-11| J: J F Egan| T: C A Dwyer| OR:  53
7/2
14
(10)
Horse silk
Shunkawakhan (IRE)
Age: 4|  Weight: 8-10| J: T Dean| T: G C H Chung| OR:  49
12/1

Non-Runners

1
(6)
Horse silk
Raydan (IRE)
Weight: 9-2|  Age: 5
T: D R Gandolfo  J: M Fenton
NR

Forecasts

Wind Flow (7/2), Mr Napoleon (IRE) (11/2), Glenridding (9/1), Shunkawakhan (IRE) (12/1), High Class Problem (IRE) (12/1), Jarvo (14/1), Mythical Charm (16/1), Theatre Royal (20/1)

Prize Money

MOST READ RACING

Follow & Track
Image of a horse race faded in a gold gradientYour favourite horses, jockeys and trainers with My Stable
Log in
Discover Sporting Life Plus benefitsWhite Chevron
Sporting Life Plus Logo

RACING TIPS

Next Off